Lighting Upgrade to Main Library, University of Dundee

Client University of Dundee
Contract Value £135k
Project Duration 16 Weeks
Principal Contractor McGill
Consulting Engineer McGill

McGill were awarded the contract to design and install a new, energy efficient lighting installation within the Main Campus Library Building at Dundee University. The new lighting arrangement utilised bespoke luminaires with an integrated controls arrangement which maximised energy saving.

Key features:

  • Upgrade of existing lighting on a phased installation basis whilst the library remained in use.
  • Utilisation of an integrated lighting controls arrangement which maximised energy savings.
  • Connection to the University’s existing master lighting control arrangements.

Read all case studies…