McGill designed 30 No. 6m M&E skids for installation along the ground and first floor corridors of the new build primary school at Whitfield, Dundee. The skids were assembled at our Dundee workshop and transferred to site for installation.

The skids consisted of 300mm wide electrical cable basket, 100mm x 100mm electrical cable trunking, LTHW flow and return mapress pipework systems and domestic water mapress pipework systems all mounted onto a 41mm x 41mm unistrut frame.

Back to Case Studies

Key Facts

Client: Dundee City Council
Contract Value: £1.3m
Principal Contractor: Robertson Construction Group
Project Duration: 28 weeks